Write a snag someone can act on
Give the next person the location, observation and action they need, without a second round of questions.
A useful snag answers three questions: where is it, what can you see, and what needs to happen next?
Start with a location someone else can find
“Door damaged” leaves the reader guessing. Name the building or area, level and room, then identify the particular component. Use the project’s agreed location names so that the record and the drawing tell the same story.
If you add a drawing pin, check the sheet and revision. A pin helps locate the observation; it does not replace a short, readable location.
Describe what you observed
Keep the observation separate from the suspected cause. “Paint chipped on the corridor face of the door leaf” describes visible evidence. “Poor installation” is a conclusion that needs support.
For an illustrative record: “Level 1, room 1.12, entrance door: paint chipped at the lower edge on the corridor face. See overview and detail photographs.” This is an example, not a customer record.
Make the next action explicit
State the action for the responsible person in plain language. Refer to an agreed finish, drawing or requirement when it is available, and identify its revision. Do not invent a specification to make a description sound complete.
If the requirement or responsibility is uncertain, ask for clarification and preserve that uncertainty. A confident-sounding sentence should not conceal a decision the project team still needs to make.
Check it before you assign it
Read the record as if you had not attended the inspection. Can you find the item, understand the issue and see what response is expected? Check that the photographs belong to this item and that the intended recipient has the right scope.
Treat AI-assisted wording as a draft. Confirm the location, observed condition and proposed action before using it. Keep the final description short enough to read on a phone.