Your Project drawer. Answers on site.

Bring drawings, specifications and contract documents together. Ask SnagSort and check the source.

Explore Project Intelligence

CONSTRUCTION SNAGGING & CLOSE-OUT

Finish the walk-around.
Not the admin.

SnagSort turns site photographs and rough notes into a structured register, gives each contractor only the items they need to act on, and brings the close-out evidence back into one place.

Built around real construction and rail snagging workflows.

Station RefurbishmentSnagSort
IMG_4281Loose fitting
S042

Secure loose access panel

Ticket office · Electrical

Owner: Contractor AOpen
Photo→Register→Contractor→Evidence

ASK SNAGSORT

Your project information.
An answer you can find.

Ask about a fitting, a finish or the wording in your contract. SnagSort finds the relevant sources and takes you to the detail, highlighted in yellow.

Ask about your project

Start by choosing a project and adding its drawings, specifications or contract.

TRY ASKING

“Which taps are specified for the toilets?”

Find the specification, open the cited page and see the relevant wording in context.

YOUR PROJECT SOURCES

Relevant wording highlighted

Document name · Page · Drawing or clause reference
Photos firstWork from what you actually captured on site.
Your registerKeep the client's existing spreadsheet headings.
Scoped contractor accessEach party sees only the items assigned to them.
Close-out evidenceCompletion photos and responses come back against the item.

HOW IT WORKS

From a phone full of photos to a register somebody can act on.

The problem is rarely taking the photographs. It is everything that happens afterwards: matching them to notes, typing the register, splitting actions by contractor and finding the evidence when the work is done.

01

Capture

Upload site photographs or paste rough walk-around notes. Keep working in the order the inspection actually happened.

02

Structure

Review the proposed snag records against the columns your project already uses. Nothing has to be remapped into a new corporate format.

03

Issue

Send each contractor a scoped portal containing their items, programme requests and the evidence they need to understand the issue.

04

Close

Contractors return completion evidence against the item. The project team reviews, rejects or signs off the close-out.

60 SNAGS · ILLUSTRATIVE EXAMPLE

The saving comes after the site visit.

Take the photographs and record your initial observations as usual. SnagSort helps avoid typing those notes again, matching photos to spreadsheet rows and building the report by hand.

120 min → 20 min

100 minutes saved · 83% less report preparation time
Under the assumptions below; illustrative, not measured.

Assumed hands-on time for 60 snags, after initial site capture
ActivityTraditionalSnagSort
Site photos & initial notesCommon to both workflows; excluded from this calculation. No capture-time saving assumed.
Turn rough notes into clear snag records60 minRetype descriptions into the register: 1 min per snag.15 minReview and correct AI drafts: 15 sec per snag.
Match & insert photos30 minFind and place the evidence: 30 sec per snag.0 extra minAssumes photos are already linked to the correct snag; checking is included above.
Register preparation subtotal90 min15 min
Assemble & check the report30 minArrange photos, format and check the finished report.5 minGenerate and check the finished report.
Report preparation total120 min20 min

Saving = (traditional − SnagSort) ÷ traditional × 100
(120 − 20) ÷ 120 × 100 = 83.3%, rounded to 83%.

These are the illustrative assumptions used in our 12 October 2026 comparison, not a timed customer study or an end-to-end inspection saving. Actual effort depends on note quality, draft corrections and report requirements. Project setup, uploads, contractor responses and closeout are outside this example.

Compare it with your own reporting workflow →

FOR TEAMS THAT SNAG REPEATEDLY

Useful on one project.
More valuable across a programme.

SnagSort is aimed at asset owners, project teams, contractors and consultants who repeatedly inspect, assign, chase and close work across live projects and estates.

Rail & stationsProperty & estatesConstructionFit-outRefurbishmentHandover
See SnagSort for client teams →

CLIENTS & ASSET OWNERS

Keep control of the close-out.

Raise items quickly, retain the master view, issue work by party and decide when evidence is good enough to close.

For client teams →

CONTRACTORS

Give each trade a clean list.

No giant shared register. Contractors open their own scoped list, programme the work and submit completion evidence against the right item.

For contractors →

CHOOSING YOUR SNAGGING SOFTWARE

Compare how you reach verified closeout.

See where SnagSort fits beside the tools your team is considering, with practical workflow differences and official sources.

SnagSort vs Fieldwire · SnagSort vs SnagR · SnagSort vs Dalux

Explore all ten comparisons

COMMON QUESTIONS

What SnagSort is — and what it is not.

What is SnagSort?

SnagSort is a web application for capturing, structuring, issuing and closing construction snagging items. It links photographs and notes to the register and keeps contractor close-out evidence against the item.

Does SnagSort replace our existing Excel register?

It does not have to. A project can use its existing column headings and export Excel-ready rows, so SnagSort can improve the site workflow without forcing a new register format on the organisation.

Can contractors see everybody else's snags?

No. Contractor access is scoped to the party and item types the project team shares with them. They do not become normal project members.

Who is SnagSort for?

It is designed for teams that snag repeatedly: client and asset-owner project teams, main contractors, specialist contractors and construction or project-management consultants.

Can we use it across several projects?

Yes. SnagSort is structured around separate projects and team membership. Organisation-wide licensing is currently handled by enquiry so the right access and support model can be agreed first.

SNAP IT. SNAG IT. SORTED.

Want to use SnagSort across your projects?

Tell us how your team currently manages snagging and close-out. We will work out whether SnagSort fits the workflow before discussing access.

Enquire about access